考虑管土接触状态的圆曲线顶管顶进力计算方法Jacking force calculation method of circular curved pipe jacking with consideration of pipe-soil contact characteristics
周雨恒,周浩,袁明,张鹏,曾聪
摘要(Abstract):
为探究不同管土接触状态下圆曲线顶管顶进力计算方法,结合港珠澳大桥拱北隧道曲线钢顶管工程的相关数据,利用国内外几种常用的曲线顶管顶进力计算公式,以及利用ABAQUS软件建立的考虑注浆作用和管土接触范围的顶进力有限元分析模型,分别进行了顶进力计算。与实测顶进力数据的对比分析表明:(1)顶进力计算值大小为:JMTA公式?上海规范公式>Shimada公式,其中考虑1/3管土接触面的Shimada公式下限计算值与实测值较为接近。(2)通过数值模拟发现,1/3管土接触状态模拟顶进力,逐渐向1/2管土接触状态接近;在注浆状态下,前期实测顶进力接近1/2管土接触状态下的顶进力;后期顶进趋近平稳时,实测顶进力接近1/3管土接触状态下的顶进力。本数值模型能够对同类型工况下顶管顶进力进行较好预测,对实际施工具有一定的指导意义。
关键词(KeyWords): 曲线顶管;顶进力;数值模拟;管土接触;注浆压力
基金项目(Foundation):
作者(Author): 周雨恒,周浩,袁明,张鹏,曾聪
DOI: 10.19509/j.cnki.dzkq.tb20210729
参考文献(References):
- [1] 马保松.非开挖工程学[M].北京:人民交通出版社,2008.Ma B S.Trenchless engineering[M].Beijing:People′s Communications Press,2008(in Chinese).
- [2] 冯鑫,张鹏,马保松,等.拼装式顶管接头抗弯刚度及管节内力计算[J].地质科技通报,2021,40(2):111-117.Feng X,Zhang P.Ma B S,et al.Joint bending stiffness and internal force calculation of assembled pipe jacking[J].Bulletin of Geological Science and Technology,2021,40(2):111-117(in Chinese with English abstract).
- [3] 周浩,周千淼,谈力昕,等.考虑注浆作用的矩形顶管竖向土压力计算模型[J].地质科技通报,2021,40(2):125-130.Zhou H,Zhou Q M,Tan L X,et al.Vertical soil pressure calculation model of rectangular box jacking considering grouting effect[J].Bulletin of Geological Science and Technology,2021,40(2):125-130(in Chinese with English abstract).
- [4] 马保松,张雅春.曲线顶管技术及顶进力分析计算[J].岩土工程技术,2006,28(5):229-232,259.Ma B S,Zhang Y C.Curved pipe jacking technology and the calculation of jacking loads for curved section[J].Geotechnical Engineering Technique,2006,28(5):229-232,259(in Chinese with English abstract).
- [5] Shimada H,Khazaei S,Matsui K.Small diameter tunnel excavation method using slurry pipe-jacking[J].Geotechnical and Geological Engineering,2004,22(2):161-186.
- [6] Shou K J,Jiang J M.A study of jacking force for a curved pipejacking[J].Journal of Rock Mechanics and Geotechnical Engineering,2010,2(4):298-304.
- [7] Shou K,Yen J,Liu M.On the frictional property of lubricants and its impact on jacking force and soil-pipe interaction of pipe-jacking[J].Tunnelling and Underground Space Technology,2010,25(4):469-477.
- [8] Zhang P,Behbahani S,Ma B S.A jacking force study of curved steel pipe roof in Gongbei Tunnel:Calculation review and monitoring data analysis[J].Tunnelling & Underground Space Technology,2018,72(6):305-322.
- [9] 张鹏,谈力昕,马保松.考虑泥浆触变性和管土接触特性的顶管摩阻力公式[J].岩土工程学报,2017,39(11):2043-2049.Zhang P,Tan L X,Ma B S.Formulae for frictional resistance considering mud thixotropy and pipe-soil contact characteristics[J].Chinese Journal of Geotechnical Engineering,2017,39(11):2043-2049(in Chinese with English abstract).
- [10] 张鹏.拱北隧道超大型曲线顶管管幕施工关键技术及理论研究[D].武汉:中国地质大学(武汉),2018.Zhang P.Research on key construction techniques and theory of super large curved pipe jacking roof in Gongbei Tunnel[D].Wuhan:China University of Geosciences(Wuhan),2018(in Chinese with English abstract).
- [11] 上海市住房和城乡建设管理委员会.DG/TJ08-2049-2016:顶管工程施工规程[S].上海:同济大学出版社,2016.Shanghai Municipal Housing and Urban-Rural Construction Management Committee.DG/TJ08-2049-2016:Construction regulations for pipe jacking project[S].Shanghai:Tongji University Press,2016(in Chinese).
- [12] Japan Micro Tunneling Association.Pipe-jacking application[M].Tokyo:Japan Micro Tunneling Association,2013(in Japanese).
- [13] Yan J X.Numerical simulation for estimation of the jacking force of pipe jacking[D].[S.l.]:Department of Civil Engineering,Chung Hsing University,2015,2(4):1-100.
- [14] Pellet-Beaucour A L,Kastner R.Experimental and analytical study of friction forces during microtunneling operations[J].Tunnelling and Underground Space Technology,2002,17(1):83-97.